Whether you’re the director of operations at a SMB or the vice president of engineering at a global enterprise, achieving operation excellence is your number one responsibility; however, a flatter manufacturing world — with globally dispersed supply chain teams — has made overseeing product development processes more challenging.

The number and frequency of product development changes and complications of big data sharing among globally dispersed partners had made managing operations difficult.

Manufacturers are constantly looking for ways to improve the efficiency of new product development (NPD). Getting to market faster, easier, smarter, and more affordably are keys to success, especially in a competitive market where opportunities appear, and disappear, at the drop of a hat. Your projects have a scheduling problem if:

1. You have tried creating a single source of truth but people prefer their own “back pocket” schedules.

2. You have frequent meetings to resolve schedule/resource conflicts.

3. Everyone is constantly firefighting and waiting on someone else/

4. People are perpetually overloaded.

5. High priority projects get done in half the time - which only means that, with correct scheduling, all projects can get done much faster.

And don’t get me even started with the mismanagement of valuable engineering resources that are often wasted on less important tasks. Bottomline is this: If you have a scheduling issue, improving processes or soft skills won't improve project delivery or resource efficiencies — only fixing the scheduling problem will.

Case in point, when it came to the new product development of Boeing’s T45 flight simulator device, the company wanted to reduce Design Development Phase cycle time from 10 months to 8 months within scope and budget, and complete projects with higher first-time quality in the Hardware/Software Integration phase

To achieve these goals, the client created a core team, introducing it to the concepts of ow-based planning and turned to Realization. Over the course of a 14-month period the Boeing T45 group realized dramatic improvements across several domains:

Design and development phase was completed 45 days ahead of schedule. And hardware-software integration phase completed 32 days ahead of schedule When it came to quality, the preliminary design review completed without a single request for action, which was an unprecedented first-time quality for a complex training device. Additionally, Boeing experienced an approximately 20% savings in the design and development phase with 25% cost reduction in the hardware/software integration phase and restored customer confidence resulting in new business.

More and more companies are turning to real-time scheduling to accelerate new product development.

Share this article

Leave your comments

Post comment as a guest

0
terms and condition.
  • Patrick Vargas

    very interesting

Share this article

John Papageorge

Tech Expert

John is a Senior Content Marketing Manager at Omnicell. He is a results-driven consultant who has worked with some of the biggest names in technology, including Oracle, Cisco, Hewlett Packard, and IBM, to improve their marketing and lead generation strategies. John holds a Bachelor of Science in Engineering and Journalism from the University of Wisconsin-Madison. 

   
Save
Cookies user prefences
We use cookies to ensure you to get the best experience on our website. If you decline the use of cookies, this website may not function as expected.
Accept all
Decline all
Read more
Analytics
Tools used to analyze the data to measure the effectiveness of a website and to understand how it works.
Google Analytics
Accept
Decline